Things to consider: Slope and Gradient, Drainage System Design, Site Location & Soil Type, Maintenance & Longevity, Local Climate & Rainfall, Surface Permeability and Budget.

Herringbone Drainage​
A permeable membrane is laid in the trenches to prevent soil from clogging the system. Perforated drainage pipes are then placed in the trenches, with the lateral pipes connecting to the main pipe. The system ensures efficient water collection and redirection to the designated drainage point.
Ultimate Tarmac Layer​
A weed-suppressing membrane is installed to prevent unwanted growth, followed by treated timber edging for a stable perimeter, MOT Type 1 stone to create a firm base, and finally, a layer of tarmac is added to provide a smooth, level surface ready for the artificial grass installation
Premium
300mm MOT Type 1 Stone​ - Installation into Soil The process begins with laying a weed-suppressing membrane to prevent unwanted growth beneath the grass. Next, a treated timber edging is installed to provide a stable perimeter for the installation. The area is then filled with a compacted layer of MOT Type 1 stone to create a firm and stable base. Finally, a layer of fine grano dust is applied and compacted, providing a smooth, level surface ready for the artificial grass to be laid on top.
Standard
100mm MOT Type 1 Stone ​ Installation into Soil. The process begins with laying a weed-suppressing membrane to prevent unwanted growth beneath the grass. Next, a treated timber edging is installed to provide a stable perimeter for the installation. The area is then filled with a compacted layer of MOT Type 1 stone to create a firm and stable base. Finally, a layer of fine grano dust is applied and compacted, providing a smooth, level surface ready for the artificial grass to be laid on top.

Our Process

1.fw.png

Contact Us

2.fw.png

FREE Site Visit

3.fw.png

Quote and Design

4.fw.png

Amendments

5.fw.png

Complete Project

6.fw.png

Aftercare

NEW Logo White low res.fw.png

See our playground equipment for EYFS, Nursery and Primary Schools here.

bottom of page